| Suspended
Platform Duo-Meter |
| |
| Stop! |
Arguing with building superintendents and contractors about
the quality of the electricity available on the building. |
| Stop! |
Expensive call-backs to see why breakers are tripping |
| Stop! |
Wondering if a job set-up needs a booster. |
| Start! |
Checking the voltage and amperage draw when the job is being
set-up. |
| Start! |
Demonstrating that your equipment is first rate equipment. |
| Start! |
Demonstrating to a building superintendent his electric current
available for use is not what he had been led to believe. |
| Start! |
Using a Duo-Meter. |
|
This unit has been designed to fill a need
for a quality job site testing unit. • Separate Volt Meter
and Amp Meter • Both units contained within one NEMA 12
Enclosure • Volt Meter reads from 0 to 300 volts •
Amp Meter reads from 0 to 40 amps • Duo-Meter can be operated
while the suspended platform is in operation • Duo-Meter
can be operated on both 120 volts and 240 Volt circuits •
For best results
(A) For full load information put Duo-Meter in-line Just below the
Extra Long “Y”
(B) For individual motor draw put Duo-Meter in-line Just below the
electric motor |
|
| A NEMA 12 enclosure is a weatherproof box with continous
hinge and quick release latches. Measuring 8”x6” x 3-1/2” |
Catalog No |
Wiring Devices |
42400
42403
|
20 amp 240 volt
30 amp 240 volt |
|
| A NEMA 12 enclosure is a weatherproof box
with continous hinge and quick release latches. Measuring 8”x6”
x 3-1/2” |